environment
Dredging Resumes At Gowanus Canal 4th Street Turning Basin
GOWANUS – The removal of the “black mayonnaise” from the bottom of the Gowanus Canal’s 4th Street Turning Basin resumed last week after issues with reinforcing bulkheads forced the project to a halt in January [/gowanus-pilot-dredging-project-stalled-bulkhead-installation-causes-damages/]. Dredging equipment at Gowanus Canal 4th Street Turning Basin (Photo: Nathan Haselby)The cleanup