There are two extra large holes along Caton Ave.
Construction at 190-192 E 5th Street
[/business/construction-starting-at-190-192-e-5th-street] is progressing. Half
the lot is dug out for, presumably, a basement and all that comes along with it.
School construction at 22 Caton
[/news/long-stalled-22-caton-place-moves-forward-and-goes-green] is kept more
secretive. A high wall