Fresh Creek Basin Bridge Opens On Westbound Side
Progress continues on the Department of Transportation’s (DOT) seven-year renovation plan of the Belt Parkway’s seven bridges and overpasses, as the Fresh Creek Basin Bridge opened to westbound traffic, according to a press release.
As we’ve previously reported, construction along the Belt Parkway has caused heavy traffic problems, so the opening of the Fresh Creek Basin Bridge should help the thousands of cars that run along the highway flow. DOT Commissioner Janette Sadik-Khan seems to thinks so.
“Each day our Belt Parkway bridges come alive, carrying 150,000 cars and connecting commuters and commerce across the city and the region,” she announced in the press release.
The bridges and overpasses were built over a half century ago, forcing the impetus for revitalization and repair:
As with the other six Belt Parkway bridges, the total replacement of the Fresh Creek Basin Bridge and its approach roadways will provide the necessary upgrades to bring the structure into compliance with current State and Federal standards. This includes wider travel lanes, safety shoulders, median barriers, improved elevation of the roadway around curves and realignment for improving sight distances and drainage enhancements. This project replaces the original Fresh Creek Basin Bridge, which, along with the other Belt Parkway bridges, was constructed more than 70 years ago and has reached the end of its useful life.