> ## Content Index
> Fetch the complete content index at: https://bklyner.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# Head’s up! Falling Concrete At DeKalb Subway Station Caused Delays, According To MTA
- URL: https://bklyner.com/falling-concrete-dekalb-avenue-station-causes-train-delays-fortgreene/
- Published: 2016-06-07T14:30:42.000Z
- Updated: 2016-06-07T15:27:28.000Z
- Author: Justin Fox
- Tags: fort greene, Nonsponsored, North Western Brooklyn, Transportation, commute, concrete, dekalb avenue, delays, mta, repairs, subway, trains, #wp

> Crews are on the scene at DeKalb Av clearing concrete that has fallen onto roadbed of the B&Q lines. 1/2 [pic.twitter.com/ak3olZntlN](https://t.co/ak3olZntlN?ref=bklyner.com)
> 
> — NYCT Subway (@NYCTSubway) [June 6, 2016](https://twitter.com/NYCTSubway/status/739907577534943232?ref=bklyner.com)

A cascade of concrete at the DeKalb Avenue station led to disruptions in service yesterday afternoon, according to the Metropolitan Transit Authority (MTA).

The concrete fell at around 1pm, causing delays on the N, R, Q, B, and D lines at the[ DeKalb Avenue](/?s=dekalb+subway) station on Flatbush Avenue and DeKalb Avenue, said the [MTA](/?s=mta).

According to [Patch.com:](http://patch.com/new-york/fortgreene/brooklyns-dekalb-ave-subway-ceiling-raining-concrete?ref=bklyner.com)

> “The debris is cleared, but we’re still working with test trains in the area” to make sure the station is safe, MTA spokesperson Amanda Kwan told Patch around 7 p.m.

> She assured us that the concrete crumbling from the ceiling at Dekalb is “non-structural,” and doesn’t speak to a larger issue at the station.

> “It doesn’t have cables, and it’s not load-bearing,” Kwan said of the concrete layer.

These impromptu repairs came on top of the[ planned service changes](/blog/2016/06/06/late-night-g-train-service-limited-due-repairs/) to the G train. The G won’t be stopping in Fort Greene or Clinton Hill during late nights for the next two weeks.