> ## Content Index
> Fetch the complete content index at: https://bklyner.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# DOT Begins Work On 5th Ave Bridge Over Green-Wood April 1
- URL: https://bklyner.com/dot-begins-work-on-5th-ave-bridge-over-green-wood-april-1-southslope/
- Published: 2013-03-25T21:41:12.000Z
- Updated: 2013-03-25T21:41:12.000Z
- Author: Christine Bush
- Tags: bridge, concerned citizens of greenwood heights, fifth avenue, Green-Wood Cemetery, #API-Imported

![5th Ave Bridge Over Green-Wood](/content/images/wp-content/uploads/2013/03/5th-Ave-Bridge-Over-Green-Wood.jpg)

Drive by Green-Wood on 5th Ave much? [The Concerned Citizens of Greenwood Heights](http://www.ccgreenwoodhts.com/work-on-5th-avenue-bridge-over-green-wood-cemetery/important-notice-5th-ave-over-greenwood/?ref=bklyner.com) tossed out a quick heads up this afternoon regarding some bridge work that is scheduled to commence on **April 1**.

According to the above notice, traffic on the 5th Avenue bridge over Green-Wood Cemetery will be cut down to one lane from **7am to 4pm, Mondays through Fridays**. No work is planned for the weekends, and the DOT estimates that construction will be complete in July 2013.

*Image via [CCGH](http://www.ccgreenwoodhts.com/work-on-5th-avenue-bridge-over-green-wood-cemetery/important-notice-5th-ave-over-greenwood/?ref=bklyner.com)*